Everything Programming

Connected Medical Devices: Why MDR Alone Isn't Enough

One medical device, two legal frameworks: why MDR approval doesn't protect you from CRA obligations — and what that means for firmware and evidence.

IC, flash, EEPROM and microcontroller programming for samples, small batches and series production – documented, traceable and delivered on schedule.

What btv SEEL® Really Contributes to CRA Compliance

CRA reporting obligations apply from September 2026. What that means for your programming process — and where btv SEEL® fits in.

NIS2 or the CRA — or Both?

Two frameworks, two different goals. We break down NIS2 and the CRA, connect them to BSI TR-03183 and EN 18031 — and explain what this means for your components.

Electronics industry 2025: Between crisis and reorientation

Chip crisis, cost pressure and shifting alliances shaped the German electronics industry in 2025. What changed in the supply chain — and why resilience now depends on earlier decisions.

EN 18031: The Deadline That's Already Here

While everyone talks about the 2027 CRA deadline, EN 18031 has been mandatory since 1 August 2025 — no transition period. Here's who's affected and what needs to be provable now.

btv SEEL®: Patent-pending secure provisioning & certification for microcontrollers – uncompromising, auditable, fully traceable.

Testing, taping, PCB analysis and reconditioning for electronic components – modular, auditable, IATF 16949 certified.

"We're Automotive, So Only UN ECE Applies to Us" — An Expensive Misconception

Stop thinking at R155/R156 and you'll miss where the CRA still applies. What that gap means for suppliers, aftermarket parts, and diagnostic tools.

What Really Happened to Your Component?

A component passes through many stations — from goods receipt to handover. Why the link between component, process step, and outcome often gets lost, and how a Chain of Trust fixes that.

CRA Compliance in the Supply Chain: Who Is Already Ready – and What That Means in Practice

From December 2027, firmware traceability, auditability and recall readiness are mandatory – for manufacturers and their entire supply chain. What the Cyber Resilience Act specifically demands and how companies can prepare now.

Cyber Resilience Act: Are You CRA-Ready?

Reporting obligations from September 2026, full applicability from December 2027. What this means for automotive and electronics manufacturers.